| Q1 | What are the maintenance requirements for the ARG? |
ANSWER This is an area where the Mitsubishi ARG excels over the competition. There is no scheduled maintenance required. We do recommend, however, that once a year the system is visually checked for anything irregular. |
| Q2 | How does the ARG compare to fin-based roll stabilization systems? |
ANSWER In order for hydraulic systems to operate effectively at ‘zero speed’ extra-large fins protruding from the sides of the hull are used. A large hydraulic pump moves the fins to create the desired effect. The pump speeds up and slows down upon demand creating a random load variance and may result in the need to install a larger generator. On the other hand, the current demand for the ARG is even and steady, keeping your generator happy. Everything (gyro and driver) is contained inside the vessel which makes docking and maneuvering easier. It is possible to even run your ARG at the dock while plugged into shore power. |
| Q3 | Does ARG have safety systems? |
ANSWER The ARG has a safety device to stop the ARG autmatically. When the ARG is operated under the following conditions, the safety device operates and the ARG stops. 1. Ambient temperature of the ARG becomes high. 2. The ARG generates excessive load by the operation under stormy weather or excessive high wave condition. 3. One of Damper breaks down. |
| Q4 | What does the Automatic return functions? |
ANSWER The ARG has a function called “automatic fast return functions” It is a function that the ARG will not be turned off even If the soyrce is turned off for a moment. |
| Q5 | What is the advantage of passive control? |
ANSWER The passive control is no electronic control components, few failures and high level of safety. Also, the passive system requires no maintenance (other than the yearly inspection). |
| Q6 | How much space does the ARG require? |
ANSWER When installing an ARG, it is important to keep clearance on both sides of the gyro to allow for adequate air flow. It is also important to be able to have access to the ARG for inspection purpose. → click here |
| Q7 | Who can install the ARG? |
ANSWER Any competent boat yard may install an ARG. However, the structural foundation should be approved by a Marine Engineer to ensure that it will safely transfer the torque to the vessels hull. Consult your dealer for more details. |
| Q8 | Does the ARG need cooling? |
ANSWER No. The ARG is designed to cool itself by using the flywheels rotation at high speed to create an air current through the unit. |
| Q9 | Where does the ARG have to be located in the boat? |
ANSWER Because the ARG is nearly maintenance free, there is no need to make convenience a priority. Following are recommendations to help you locate the ideal place to install your ARG. 1. Take into consideration the ships center of gravity and balance. 2. Ventilation is required if locating in a confined space. 3. Locate the ARG in a soundproof area like an engine room. 4. Make sure the area selected is strong enough to transfer the generated torque to the vessel. The primary structural beams are a good choice 5. The ARG does not have to be mounted on the centerline to be effective. For example, an ARG will be equally effective sitting across from a generator. |
| Q10 | How much power does the ARG require? |
| Q11 | What size ARG do I need for my boat? |
ANSWER 1. Sizing depends on the objective of the boat owner. 2. Mitsubishi has three different models of gyros. 3. Each model will provide excellent roll reduction for a boat depending on the vessels displacement. Every vessel has it is own characteristics. For more details fill out the ‘Vessel Information’ Section and send it along with an inquiry. → click here 4. We will provide you with answer |
| Q12 | Can I use multiple ARGs on one boat? |
ANSWER Yes. Depending on the type of vessel, it may be necessary for you to use multiple ARGs. |
| Q13 | Do you have any dealers? |
| Q14 | What is the warranty on the ARG? |
ANSWER 24 months after delivery to first-use purchaser of the boats, but not exceeding 36 months after the date of the Bill of Lading. (Commercial and military use, Japanese market is different from above.) |
|